Mrs. Nair sighed. "The previous engineer said we were saving money on copper."
Arjun pointed at the melted junction box. The air still smelled of burnt rubber and ozone. "The motor on Line 4 was pulling 180 amps. This feeder cable was rated for 100. The conductor was too small for the load." size of conductor
"And now you're losing a week of production and paying me three times his rate to fix it," Arjun replied. " Arjun replied.