Naviswork 'link' -
Attach tasks from the construction schedule to objects in the model. Run a 4D simulation to see if the schedule is feasible. Spot sequencing issues: "You're installing ceiling grid before the fire alarm rough-in."
Enter (Autodesk Navisworks). It is not a modeling tool. You do not draw walls, pipes, or beams in Navisworks. Instead, it serves as the aggregation, review, and coordination platform —the digital roundtable where all those disparate models come together to be analyzed, clash-detected, scheduled, and visualized. naviswork
Each discipline models their scope in their preferred software (Revit, Civil 3D, Tekla, etc.). Critical: They assign proper properties (metadata) like "Level," "System Type," "Installation Date," and "Status." Attach tasks from the construction schedule to objects
Run clash tests. For example: "Show me all clashes between Structural Framing category and HVAC Ducts, with a clearance of 50mm." Results are reviewed, assigned to responsible parties (e.g., "Structural engineer: move beam"), and tracked. It is not a modeling tool