maximum demand calculator

To take control of this, you need a . What is Maximum Demand? Maximum Demand is the highest average load (usually measured over 15, 30, or 60-minute intervals) that a system draws during a billing period.

Disclaimer: This guide provides estimation methods. Always consult a licensed electrical engineer for final design and safety compliance.

Grab your last 12 utility bills. Find the highest "Demand" value. Compare it to the sum of your connected load. You will likely find you are paying for capacity you rarely use.

Where is the Demand Factor (or Diversity Factor). Standard Demand Factors (Reference Guide) | Load Type | Typical Demand Factor | Notes | | :--- | :--- | :--- | | Lighting (Office) | 0.75 – 0.90 | Fluorescent/LED | | Lighting (Warehouse) | 0.95 – 1.00 | High bay, always on | | General Power Outlets | 0.10 – 0.50 | Varies heavily by occupancy | | HVAC (Cooling) | 1.00 | Worst-case summer day | | HVAC (Heating) | 0.80 – 1.00 | Electric heat is high demand | | Lifts / Elevators | 0.40 – 0.60 | Largest motor only | | Motors (Continuous) | 1.00 | Pumps, compressors | | Motors (Intermittent) | 0.40 – 0.60 | Conveyors, cranes | | Kitchen Equipment | 0.40 – 0.70 | Not all used at once | The "Pro" Calculator Tool (Manual Method) If you don't have a power analyzer, use this systematic approach to estimate your MD.

In most commercial tariffs, the electricity bill is split into two parts: and Demand Charges (kVA/kW) . The Demand Charge is often the larger shock—it is based on the highest average load recorded during a billing window.

In the world of electrical engineering and facility management, Maximum Demand (MD) is a critical metric. It isn't just about keeping the lights on; it directly impacts your capital expenditure (cable/transformer sizing) and operational expenditure (electricity bills).

The Missing Header
One sharp idea each week to help you handle messy spreadsheets, weird exports, and undocumented CSVs — faster and smarter.

News  25th Apr, 2025: Tablecruncher goes Open Source!

Features

Open files bigger than 2GB and containing more than 15 million rows. Opening a 100MB CSV file with more than 500,000 lines takes less than 5 seconds on a dual-core Macbook Pro.
Use Javascript as a macro language to manipulate your CSV files. A simple API gives you access to all cells and you can change cell content as well as do abitrary calculations.
Export your table data to JSON. The exported JSON is an array-of-objects if there's a header row present in your CSV data. Otherwise you'll get an array-of-arrays.
🗃
Automatically detects most CSV file formats and file encodings for you. If you want, you can easily override the automatic detection and choose the appropriate CSV parameters.
📄
Open and save CSV files with one of these encodings: UTF-8, UTF-16LE, UTF-16BE, Latin-1 (ISO-8859-1) and Windows 1252 files. (These list will be extended in future updates.)
🔎
Use the powerful Find and Replace dialog to search for patterns in your table or in a selected area. Regular Expressions according to the ECMAScript 5 standard are supported.
🎨
Enjoy crunching your data with four beautifully designed color themes, including a dark theme that fits well with the Mac's dark mode.
𝌘
Flag rows manually or with the Find and Replace dialog and export flagged rows as a new CSV file.
𝌅
Modify your CSV data grid easily. You can sort lines alphabetically or numerically, move columns right or left or delete columns. Or set your first CSV row as a header row.

Maximum Demand Calculator May 2026

To take control of this, you need a . What is Maximum Demand? Maximum Demand is the highest average load (usually measured over 15, 30, or 60-minute intervals) that a system draws during a billing period.

Disclaimer: This guide provides estimation methods. Always consult a licensed electrical engineer for final design and safety compliance.

Grab your last 12 utility bills. Find the highest "Demand" value. Compare it to the sum of your connected load. You will likely find you are paying for capacity you rarely use.

Where is the Demand Factor (or Diversity Factor). Standard Demand Factors (Reference Guide) | Load Type | Typical Demand Factor | Notes | | :--- | :--- | :--- | | Lighting (Office) | 0.75 – 0.90 | Fluorescent/LED | | Lighting (Warehouse) | 0.95 – 1.00 | High bay, always on | | General Power Outlets | 0.10 – 0.50 | Varies heavily by occupancy | | HVAC (Cooling) | 1.00 | Worst-case summer day | | HVAC (Heating) | 0.80 – 1.00 | Electric heat is high demand | | Lifts / Elevators | 0.40 – 0.60 | Largest motor only | | Motors (Continuous) | 1.00 | Pumps, compressors | | Motors (Intermittent) | 0.40 – 0.60 | Conveyors, cranes | | Kitchen Equipment | 0.40 – 0.70 | Not all used at once | The "Pro" Calculator Tool (Manual Method) If you don't have a power analyzer, use this systematic approach to estimate your MD.

In most commercial tariffs, the electricity bill is split into two parts: and Demand Charges (kVA/kW) . The Demand Charge is often the larger shock—it is based on the highest average load recorded during a billing window.

In the world of electrical engineering and facility management, Maximum Demand (MD) is a critical metric. It isn't just about keeping the lights on; it directly impacts your capital expenditure (cable/transformer sizing) and operational expenditure (electricity bills).

What others are saying

Not convinced yet? Head over to the GitHub repository to check out more details.

Blog

New beta for Tablecruncher 2

May 31, 2023

A new beta version of Tablecruncher 2 is available

First early beta for Tablecruncher 2

Dec 20, 2022

A very early first beta version for the completely rewritten version 2 of Tablecruncher is available

Roadmap for Version 2

Sep 12, 2022

The completely new version 2 for Tablecruncher is due this autumn.